New Path Networks Highway 50 Fiber-Fed Distributed Antenna Communications
System Projects: El Dorado County, California.
Managed the preparation of Proponent’s
Environmental Assessments for the installation of fiber-fed distributed
antenna communications systems between Strawberry and Kyburtz, California
along Highway 50 in El Dorado County, California. Managed the environmental
planning of the proposed project. Consulted with local, state, and
federal resource agencies. Conducted reconnaissance-level biological
surveys of the proposed project areas. Participated in the CPUC
CEQA environmental review process for the project.

AT&T Sand Creek Fiber-Optic Cable Relocation Project: Colusa
County, California.
Managed the environmental planning and permitting
of fiber-optic cable and conduit relocation project under Sand Creek
in Colusa County, California. Conducted permit feasibility assessments,
consulted with state and federal resource agencies, and directed
pre-construction biological surveys. Prepared CDFG Streambed Alteration
Agreement, RWQCB Section 401, and USACE Nationwide # 13 permit application
packages. Obtained permits from CDFG, RWQCB, and USACE for the project.

AT&T Hollow Tree Road Fiber-Optic Cable Relocation and Road
Reconstruction Project: Mendocino County, California.
Managed the environmental planning, permitting,
and monitoring of fiber-optic cable, conduit relocation, and road
reconstruction project. The road crossing of the unnamed stream
was washed out during a large thunderstorm during January 2006.
As a result, the fiber-optic cable crossing under the stream was
exposed, and was in extreme danger of being damaged during another
rain event. Conducted emergency consultations with CDFG, RWQCB,
USFWS, USACE, and NOAA Fisheries to obtain emergency permits for
relocating the fiber-optic cable, and reconstruction approximately
200 feet of the damaged roadway. Prepared and obtained after-the-fact
permit applications from CDFG, RWQCB, USACE, and NOAA Fisheries.
Conducted Section 7 consultations under the federal ESA for steelhead.
Managed environmental compliance monitoring and post-construction
reporting for the project.

New Path Networks Turtle Rock and Bollinger Canyon Fiber-Fed Distributed
Antenna Communications System Projects: Southern and Northern California.
Managed the preparation of Proponent’s
Environmental Assessments for the installation of fiber-fed distributed
antenna communications systems in Irvine and Cupertino, California.
Managed the environmental planning of the proposed projects. Consulted
with local, state, and federal resource agencies. Conducted reconnaissance-level
biological surveys of the proposed project areas. Participated in
the CEQA environmental review process for both projects (CPUC was
the lead agency for both projects).

Looking Glass Networks Bay Area Fiber-Optic
Cable Lateral Customer Connection Projects: Northern California
Managed and prepared California Public Utilities
Commission Notice of Construction permit packages for numerous lateral
fiber-optic conduit and cable installation projects in San Francisco,
Palo Alto, Sunnyvale, Santa Clara, Cupertino, and San Jose, California.
Conducted biological surveys and habitat assessments and guided
cultural and archeological surveys of the sites. Consulted with
the CPUC to ensure that the client received permit clearances within
twenty-one days of submitting permitting package. Guided environmental
compliance and construction monitoring of project installation.

AT&T Dunnigan to Manchester and Cloverdale
to Santa Rosa Fiber-Optic Cable Installation Projects: Northern
California
Managed the environmental mitigation monitoring
and compliance program for projects involving construction along
approximately 150 miles of route and more than 250 crossings of
streams and wetlands in Lake, Mendocino, Napa, Sonoma, and Yolo
counties in northern California. From project planning to post-construction
monitoring, duties entailed:
- Completion of environmental planning documents under CEQA
- Public hearings before city councils
- Extensive agency consultation (USACE, USFWS, NMFS, CDFG, RWQCB,
BLM, and five California counties)
- Project permitting
- Bilingual environmental compliance training for construction
workers
- Mitigation monitoring (biological, cultural—including
Native American monitors—and paleontological) during construction
and post-construction monitoring
- Coordination with third-party monitors
- Coordination with contractors and regulatory agencies regarding
compliance issues and consultations
- Preparation of weekly and monthly compliance reports during
construction as well as yearly post-construction monitoring reports
- Preparation and negotiation of re-vegetation plans and financial
guarantees
- Coordination with the client’s legal counsel
Project completed while at Ecology and Environment,
Inc.

Comcast Broadband Hub Station Project: Sebastopol, California
Managed the environmental planning, permitting,
and monitoring of Comcast Broadband hub site construction project
in Sonoma County, California. Conducted permit feasibility assessments,
consulted with state and federal resource agencies, and directed
pre-construction biological surveys. Conducted Section 7 consultations
under the federal ESA and secured “No Take” determination
from the USFWS for the California tiger salamander. Managed environmental
compliance monitoring and post-construction reporting.
|
|

AT&T Highway 128 Fiber-Optic Cable
Relocation Project: Mendocino County, California
Managed the environmental planning, permitting,
and monitoring of fiber-optic cable and conduit relocation project
under Dry Creek in Mendocino County, California. Conducted permit
feasibility assessments, consulted with state and federal resource
agencies, and directed pre-construction biological and cultural
surveys. Prepared a CDFG Streambed Alteration Agreement permit package.
Conducted Section 7 consultations under the federal ESA for steelhead
trout and the foothill yellow-legged frog. Obtained authorizations
from the USFWS and NOAA Fisheries and permits from the CDFG for
the project. Managed environmental compliance monitoring and post-construction
reporting.

AT&T Fiber-Optic Cable Repair Projects:
Monterey and San Luis Obispo counties, California
Managed environmental planning, permitting,
and environmental monitoring of multiple small construction and
repair/maintenance projects
in Monterey and San Luis Obispo counties, California. Conducted
permit feasibility assessments, consulted with state and federal
resource agencies, and directed pre-construction biological and
cultural surveys. Conducted Section 7 consultations under the federal
ESA for the San Joaquin kit fox and purple amole. Secured authorizations
from the USFWS and permits from the CDFG within weeks. Managed environmental
compliance monitoring.
Project completed while at Ecology and Environment,
Inc.

SPRINT Point Arena to Oakland
and Oakland to Sacramento Fiber-Optic Cable System Project: Northern
California
Prepared a CEQA Initial Study and Mitigated
Negative Declaration for the proposed construction of a linear fiber-optic
cable system from Point Arena to Oakland and from Oakland to Sacramento,
California. Project included construction adjacent to the San Francisco
Bay in Contra Costa County and the Sacramento Delta. Coordinated
with client engineers and contractors regarding project routing
and design. Coordinated with local, state, and federal regulatory
agencies to identify and address potential concerns and issues at
the outset of the project. Prepared existing conditions, impact
assessment, and mitigation sections for hydrology/water resources
and biological resources portions of the Initial Study and Environmental
Assessment. Conducted wetland and stream course delineations. Managed
the resource data collection database.
Project completed while at Ecology and Environment,
Inc.

AT&T Rocks Road Bridge Replacement Project: San Benito County,
California
Managed the environmental planning and permitting
of a bridge replacement project across a stream paralleling Rocks
Road in San Benito County, California. Conducted permit feasibility
assessments, consulted with state and federal resource agencies,
and directed pre-construction biological and cultural surveys. Prepared
a CDFG Streambed Alteration Agreement permit package, SWQCB Section
401 permit application, and USACE Nationwide 14 permit application
for the project. Conducted Section 7 consultations under the federal
ESA for California red-legged frog and California tiger salamander.
Secured authorizations from the USFWS and permits from the CDFG,
RWQCB, and USACE.
Project completed while at Environmental Resources
Management, Inc.

Level(3) Merced to Bakersfield
Fiber-Optic Cable Installation Project: Central Valley, California.
Conducted wetland and stream course delineations
for a 300-mile, linear fiber-optic cable installation from Merced
to Bakersfield, California. Conducted pre-construction and clearance
surveys of San Joaquin kit fox, western burrowing owl, California
tiger salamander, red-legged frog, and northwestern pond turtle.
Conducted first-party biological compliance monitoring.

TYCOM Marine Fiber-Optic Cable Landing: Hermosa Beach, California
Prepared a CEQA EIR on a fast-track basis (six
months from Notice to Proceed to EIR certification) for proposed
marine fiber-optic cable landings in Hermosa Beach, California.
Coordinated with client engineers and contractors regarding project
routing and design. Directed staff and subcontractors conducting
field terrestrial biological surveys. Coordinated with local, state,
and federal regulatory agencies to identify and address potential
concerns and issues up front. Prepared terrestrial resources section
of EIR. Consulted with the NOAA Fisheries, USFWS, USACE, and CDFG
for terrestrial wildlife species.
Project completed while at Ecology and Environment,
Inc.

El Paso Global Networks El Paso, Texas, to Los Angeles, California,
Fiber-Optic Cable Installation Project
Managed the third-party environmental compliance
program for the project. The client was the Arizona State Office
of the Bureau of Land Management (BLM). Prepared a Mitigation Monitoring
Plan. Coordinated and directed meetings and communications between
local, state, and federal agencies regarding compliance issues.
Project completed while at Ecology and Environment,
Inc.
|